Check for proper IP/NEMA ratings and material quality. Ensure safe placement: install in dry, accessible areas with good ventilation and at appropriate height (typically ~1. Practice good wiring: secure grounding, neat cable management, proper insulation, and correct wire. Indicate the Military Department Preparing A ctivity responsible for the document. ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND (Preparing Activity) AIR FORCE CIVIL ENGINEER CENTER Record of Changes (changes are indicated by 1. Date Location. Cathodic Protection: Where cathodic protection is required by the project criteria or other instructions provide field measurements and recommendations for the need and type of system to be employed. Lightning Protection: Perform a Lightning Hazard Risk Assessment per NFPA 780 to determine if. The aim of this manual is to assist those concerned with formulating requirements for electrical engineering in the construction of new infrastructure and facilities, existing facilities and infrastructure undergoing refurbishment, leased facilities for use or occupation by Defence and maintenance. The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD (AT&L). Provide documentation demonstrating coordination with the Army DPW, Air Force BCE or privatized utility as applicable. Provide names, phone numbers and email addresses for all people con acted and guidance received.