The height above ground of any wire or cable which is attached to a support carrying any overhead line shall not be less than 5. 163 describes criteria for the installation of optical fibre cables defined in Recommendation ITU-T L. FO-VC2 JOINT USE - VERICAL MIDSPAN CLEARANCES 48. 5 feet below the base of rail (BBR) will be maintained except that a minimum of 5 feet BBR will be maintained for fiber optic cable wirelines. OR FTTP has been put in but runs to the nearest telegraph pole rather than following the existing setup, this is around 70m away in a straight line and has line of sight issues with tree in the way.