The interconnection system began by including and built by AyEE, HIDRONOR. The Argentine Interconnection System (Spanish: Sistema Argentino de Interconexión, SADI) is a wide area synchronous grid that links the regional networks of all Argentinian provinces, with the exception of Tierra del Fuego. It is also connected to the power grids of several neighboring countries. The network is 20,296 kilometres (12,611 mi) long, of which 14,197 kilometres (8,822 mi) rep. 2019 BlackoutOn 16 June 2019, a large-scale struck most of, all of, and parts of. It was caused by an operational misbehavior from, a operator in Argentina.